Since the beginning of May, continuous rainfall has brought great influence to the underground operation and construction.Jidong oilfield downhole operation company layer upon layer of protection, strict implementation of the summer "ten prevention" measures, focus on the inspection of workover rig support parts, ground anchor and tension rope, to prevent excessive rainfall caused by rain immersion loose; Arrange special personnel to watch the liquid quantity of 15 cubic meters and 40 cubic meters tank pool to prevent overflow; Inspect the workover rig, wellhead and the area under the tubing bridge, and collect water in time to prevent the occurrence of pollution accidents. At the same time, the management of safe electricity use during the rainy season will be strengthened. Strengthen the grounding inspection of derrick, duty room and electrical equipment to ensure that the lightning protection grounding is in good condition; Special inspection of on-site circuit and electrical equipment, replacement of aging lines and electrical components with shell defects, to ensure safe use of electricity in rainy season. In addition, improve the anti-pollution level, in the fish and shrimp pond, coastal beach and river and other sensitive areas of construction, it is prohibited to work in the pipeline of liquid and liquid storage tank when moving liquid landing; The construction site after rain water is strictly prohibited from external drainage, oil and sewage in time to clean up, to eliminate pollution after rain. Strengthen the spot inspection during the rainy season, find out the hidden trouble on the spot and urge the rectification. Up to now, the company has completed 55 Wells of various types in May, and all the work is running safely and smoothly.
At 11 o 'clock on July 8th, at the pumping unit at the 40-12-024, a dark-faced man was using his calloused hands to wheeze sledgehammers and tighten counterweight screws. He is Lu Dengyu, an employee of the no. 10 turning point in the third area of the oil production operation in the Liao he Oilfield Xu exiling Oil Production Plant, a post of 90 years of service and party age.
No struggle, no youth Dengyu started working as an oil producer eight years ago at the age of 22. In order to make the knowledge become "rolling oil flow", he consulted the old master humbly, while carefully fumbling for the temper of the oil well. After four years of refining, he grew from an oil "recruit" to the backbone of production, and summed up the "six steam flooding management methods" such as high temperature control sleeve, water-mixed crystal, subsection sampling, which effectively improved the production efficiency of steam flooding Wells.
"Party members must always want to be in the front, dry in the front, walk in the front, play a good example for everyone! “In September 2020, Lu Dingy came to the 10th turning point. There are more than 80 Wells at the turning point of the meter, which is the station with the largest number of Wells opened in the whole operating area. Moreover, it has a large jurisdiction area, accompanied by problems such as high temperature and pressure of steam flooding, aging equipment and facilities, and excessive concentration of hydrogen sulfide. He bravely took on the heavy burden, conducted field investigation with his colleagues during the day, and formulated countermeasures based on his experience at night, so as to realize the safe and stable production of the oil well under the best condition, and the daily liquid output was up to more than 1,000 tons.
"Production and efficiency, I think there is room for improvement..."Lu Dengyu has made more efforts than ordinary people in order to make the upper production measures and cost-cutting and efficiency increase scheme closer to reality. It became his routine to be the first one in the morning to lead the staff to the site and review the production and cost data before leaving in the evening.
"I am a party member, urgent, difficult, dangerous, heavy have ME in! “This is what he said, but also in practice. In the first half of this year alone, he has organized the implementation of maintenance and tapped potential for 426 Wells, increased oil by 587 tons, repaired more than 40 kinds of sluice gates, repaired 36 oil-doped meters, used long stop-well casing gas to clean lines for 52 Wells, and used high-pressure hose to deal with crystallization for 13 Wells, resulting in an effect of 385,000 yuan.
Lu Dengyu takes advantage of the work to lead the whole staff to learn the party history "required course”. At each pre-class meeting, he would organize party members to tell stories about the party's century-old history and share management experience, which effectively stimulated the sense of love and dedication of all members and led to the rectification of 87 low, old and bad problems, which greatly improved the appearance and management level of the well station.